Overview of the operation rules of die cutting machine

(1) Operation rules before starting

1. Check the handover record to understand the operation of the equipment

2. Check the quantity of die-cutting and product quality according to the production schedule according to the production scheduling plan.

3. After checking and confirming that there are no foreign objects on the machine, thoroughly inspect and adjust the machine.

(2) Operation specifications before starting production

1. Check whether the die cutting is the same size as the box sample

2. Check if the product has a mouth

3. Choose the bottom template material according to the number of products, paper type and carton structure

4. Install the die-cutting plate and lock the fixing screws to prevent the die-cutting plate from loosening. Make the bottom template, the thickness of the bottom mold is the thickness of the paper of the die-cut product

5. Install the bottom template, clean the surface debris and lock

6. According to the thickness of the paper, adjust the die-cutting pressure. During the adjustment, the pressure should be slowly increased from light to heavy to 80% penetration, otherwise it will cause equipment damage

7. Adjust the position of the upper and lower ejector pins of the unloading part, and lock it

8. After adjusting each part, produce samples according to the box sample requirements, check that there is no quality problem, and the normal production can be produced after the supervisor signs the sample.

(3) Operating specifications in production

1. Carry out the operation according to the production requirements and signing standards of the construction order.

2. Sampling inspection every 5-10 minutes during the production process, quality problems are reported in time, and production can be continued after being resolved.

3. After each version of die-cutting, a comprehensive inspection should be carried out and fill out the "die-cutting process sheet". If there are quality problems, the products should be placed separately in time, and fill in the "Abnormal Product Process Sheet".

4. If a material problem is found, the production should be stopped, and the "Feedback Sheet for Poor Quality of Production Materials" should be filled out to allow relevant departments to coordinate and resolve it in preparation for subsequent production.

(4) Operation specifications after the end of production

1. The captain should fill in the "Daily Cutting Daily Report", "Statistical Table of Process Quality Status" and "Daily Inspection Form of Production Equipment" every day.

2. Put the die-cut products separately according to qualified products and defective products, and mark them clearly.

3. At the end of production, the equipment should be stopped at the mold opening location.

4. Maintain the equipment according to the daily maintenance content.

5. Carefully fill in the handover record.

6. Turn off the power.

Our outdoor hammock is with its global pioneering design, breaking through convention, utilizing textilene boldly, Sevenze`s garden hammock receives rich reputation. Meanwhile, hard work on hammock stand brings its gorgeous appearance and outstanding quality. Each hammock set, through strict safety test before reaching customer,is safe, reliable, and permanently guaranteed.Hammock

Hammock Bed

Hammock Bed,Indoor Hammock,Chair Hammock,Camping Hammock

SEVENZE INDUSTRAL CO.,LIMITED , http://www.sevenze.com