In the winter, the decoration needs attention. The building materials know more about cold and warm.

First, the wood moisture in winter is the lowest, the degree of drying is good, and the wood is not easy to crack and deform. The indoor and outdoor temperature difference can also test the quality of the wood and its construction. Generally, after only one or two months, potential quality problems (such as dry cracking and deformation) will be reflected in time. At this time, the paint has not been painted and delivered. The construction personnel can modify or dismantle them immediately, so that the quality of the wooden decoration can be guaranteed for a long time.

Second, the winter does not affect the paint spray. The quality of the paint directly affects the final effect of the decoration. Because the baking of the indoor heating in the winter makes the air dry, the paint dries quickly, which effectively reduces the adsorption of dust particles in the air. good.

Third, the humidity and temperature in winter are suitable for the plates used in the decoration. Such as sandwich panels, all kinds of plywood and gypsum products such as gypsum board, plaster line and so on.

Fourth, due to seasonal reasons, the market price of materials is lower, which saves part of the renovation costs; the overall renovation project in winter is less, and the workers will be more elaborate in construction; the decoration company will also give multiple benefits that are not usually available!

Due to the influence of the environmental climate on the quality of the decoration construction, it is not suitable for decoration in the winter. In fact, winter decoration has advantages that are unmatched in other seasons. For example, indoor air drying in winter, paint drying is faster, reducing the adsorption of dust particles in the air, and the color and quality of the brush are excellent; the moisture content in the wood It also reached the lowest point in the year. At this time, the decoration can basically prevent the phenomenon of cracking and deformation. Therefore, as long as the technical problems in winter are easy to control, winter will be a good time to renovate.

Different construction techniques and schemes should be adopted for different climatic characteristics, so that the winter decoration construction can give full play to the superiority of its climatic characteristics. Usually the traditional winter decoration starts from solving the problems that can occur in winter. For example, the woodworking work should be left with seams, the putty should not be too thick, and the wall and floor tiles should be warmed and then attached. At present, many decoration companies have launched feasible solutions. After three years of hard work, they have used 12 technical solutions to compare and test 120 prototypes and then sort out a number of successful methods of scientific construction.

According to the introduction, before the construction, according to the influence of temperature and humidity on materials and processes, the decoration company should be equipped with humidification and heating equipment on site to adjust the construction site environment to meet the process requirements; at the same time, for wood, wall and floor tiles, Paints and other materials are classified and processed in a constant temperature and constant humidity for three days. After completion, three days of indoor and outdoor convection ventilation shall be carried out to observe carefully whether there is any unexpected change. As long as you pay more attention to the following problems that are easy to occur in winter, you can ensure the smooth completion of home improvement.

Wood deformation solution: The main materials used in the decoration, especially the wood, should be placed in a room with heating equipment for three to five days to volatilize the moisture generated by the temperature change. This is done so that the moisture content of the wood is close to the level inside the house, which avoids wood deformation after the decoration.

Veneer cracking solution: After the decorative panel is transported to the construction site, use a dry towel to wipe off the floating dust and apply the varnish back cover twice. All decorative panels should be laid flat, with a large core plate at the bottom and a large core plate pressed on the top, which can not be placed upright, thus preventing the panel from cracking and lifting.

Wall cracking solution: When the putty is not dry, the paint is applied. The wall is easy to "sweating" and even has a large area of ​​cracking. The window is often ventilated, and the time is best selected between 10 am and 4 pm. This period of time is relatively high, which can prevent the new batch of putty from freezing. After the first time the putty is completely dried, the second time the putty is approved. After the second time, the putty is completely dried, and then carefully sanded with sandpaper.

Gypsum line cracking solution: When carrying out gypsum board ceiling work, the moisture content of the wood keel must be controlled below 12%, and the keel must be firm and there should be no looseness, thus preventing cracks in the gypsum board ceiling. A gap of about 0.5 cm is left between the gypsum board and the joint between the gypsum board and the wall surface. The gypsum powder and the latex are used to adjust the caulking, and then the kraft paper is attached, and the putty is added to prevent the plaster line. Cracking.

Poor paint effect: If you encounter windy weather, it is not suitable for oil work. Because winter sand is large, dust and dirt are easy to adhere when paint and paint are not dry. You should choose windless weather to paint and ensure paint. The ambient temperature to be applied is not less than 5 degrees Celsius, and the ambient temperature at which the varnish is applied is not less than 8 degrees Celsius. It should be applied strictly according to the temperature in the product description. To prevent sand from falling on the surface of the paint, close the doors and windows.

Improper solution for seams: When the winter is being renovated, the seams of the doors and windows should not be too small, so as to avoid the summer heat expansion and tightness. When laying solid wood flooring, it is necessary to leave a 2 mm expansion joint around the door. When making furniture, it is necessary to leave a joint seam of about 0.1 mm. The seam between the floor and the wall is formed by the floor beading, which can be well handled. The gap between the wall and the floor is too large.

Tile shedding solution: Winter tiles and tiles should be soaked before being paved, so that the water must be saturated. Only in this way, when bonding, the cement does not adhere to the cement due to the suction water, and the phenomenon of emptying and falling off occurs. In addition, whether it is a wall tile or a floor tile, it needs to be moved from the outdoor to the indoor after 24 hours, and it can be laid when it is adapted to the indoor temperature, so as to avoid the phenomenon of emptying and falling off after the construction;

we have many kinds Baby Clothes for you reference, baby vest, baby romper with long sleeves or short sleeves, 8/5 pcs baby sets and so on. We have own designers and they are professional and innovative. It's pleasure you choose our own designs. We also accept OEM. Our products are made of non-toxic and environmental materials, they are comfortable, healthy and cute. Let the angel feel the warm and comfort by your best choice.

5 pcs baby clothes set

baby clothes with blanketbaby vest and baby pants

baby romperbaby clothes and pants

Baby Clothes

Baby Clothes,Cotton Baby RomPEr,Baby Cloth Sets,Cotton Baby Suit

Zhaoxian Tengxing Plastic Fashion Co., Ltd , https://www.goodraincoat.com