Drop test machine operation skills

1, wiring: the power of the supplied three-phase power and a ground line access, the control box with the drop test is also shipped with the cable plug adapter according case connected, and test run up / down command. (If there is a press of the up button but a down button or a down button when the trial run is up , just change the number of phases at the power supply .

2 , drop height adjustment: Open the host power , set the test required height (as follows) , press the rise key to reach the set height ; if stopped in the middle , you must make it reach the set height before you can perform the reverse Run the command ;

3 , put the measured object on the work surface, and then use a fixed rod to be fixed ;

4. Press the up key to raise the measured object to the set height ;

5 , press the drop button to make the workbench moment away from the measured object, the measured object to do a free fall motion ;

6. Press the reset button to return the workbench to working condition .

7. If the test is repeated , repeat the above steps .

8. After the test of the bi- lateral drop tester : Press the down key to make the work table run to the lowest position. Turn off the power button .

Professional create value, Dongguan Haida cast quality! Dongguan Haida equipment specializing in the production of carton compression testing machine , burst strength testing machine, drop test bench , vibration testing machine and other packaging testing equipment, welcome to call!

For more detailed product series and related technical parameters, please contact:

National Unified Service Hotline: 400-0711-808

Haida International Instrument: 0769-89280808

company website:

Dining Room Furniture

dining table set, dining table and chairs, extendable dining room table, dining room furniture sets

Auxford furniture , https://www.auxfurniture.com